December 28, 2014
First and second electric columns
To receive electricity, we first had to install a concrete column. We chose a place that seemed good at the entrance to our driveway, built the column, and started the process of applying for electric service.
Right as the worker from the electric company was scheduled to arrive, our neighbor (on the other side of our driveway) fussed that we didn't have permission to drive over a small corner of his land to enter our driveway. Our driveway is at an angle sharper than a right angle relative to the road, and the road is very narrow with a 5-foot drop-off into a cornfield on the other side. The column's position at the entrance further complicated the entry, so we had to make a quick, difficult decision to tear down the column and build another one further up the driveway on the other side.
We had three days before our application would expire, so the workers got right to work the next day, finally finishing pouring the new concrete column in the dark. Our complaining neighbor wasn't happy with the results, because now the column is close to his house, but we discovered that the new position actually benefits our entryway more, since our car is able to pass around the corner without coming close to hitting it.
The electric company worker arrived the next day and installed our new line!
| First they prepared the rebar grid. |
| The column was on the edge of our land, so they built the footer one-sided. |
We had three days before our application would expire, so the workers got right to work the next day, finally finishing pouring the new concrete column in the dark. Our complaining neighbor wasn't happy with the results, because now the column is close to his house, but we discovered that the new position actually benefits our entryway more, since our car is able to pass around the corner without coming close to hitting it.
| The new column is now on the other side of the driveway. |
December 23, 2014
Finally moved the water pipe
The next week, the leaders assigned to the second water project came out to do the work of moving the pipe. No one but those particular leaders is allowed to cut or work on the pipes in any way.
Praise the Lord, all turned out well, and the downstream neighbors were happy, except for our closest neighbor, Felipe. He was complaining the next day that his faucet wasn't working well, and it must be our fault. After talking through several ideas including digging new ditches and running all new pipes to his house, our builder walked over to his house to see the faucet for himself. The faucet was old, and the mechanism had stopped working! So we bought him a new faucet, our builder installed it, and everyone was happy!
| Detouring around the house site |
| Felipe and Sylvia's house |
| Diego and his helper replacing the faucet in our neighbors' "kitchen sink" |
December 14, 2014
Visit from leaders
Once the water pipes were uncovered, we went again to the community leaders to
ask them to reconsider moving them, since building a house over water pipes isn't a
good idea, especially in an earthquake-prone area. They agreed on a time to come out and see the situation.
We were advised that it is traditional to buy soft drinks for the leaders when they come to discuss a matter, so our builder bought 22 sodas to hand out.
The end result of the discussion was that they decided to ask the community to vote at the next monthly meeting, since this is something that affects others. There are apparently mixed feelings about moving water pipes, some wanting to move them, others not wanting to modify the system.
The monthly meeting was held the following week, and we were praying hard. We were actually pleasantly surprised that the leaders presented our case in a positive manner, and then the people had a bit of discussion (which we didn't understand because it was in K'iche'). Afterwards, they asked what everyone thought, and there was a chorus of "otz," meaning "ok!" We were so grateful!
| Here they come! |
| They discussed the matter for quite a while, some agreeing and some disagreeing. |
| Veronica was happy there was one extra Pepsi for her. |
The monthly meeting was held the following week, and we were praying hard. We were actually pleasantly surprised that the leaders presented our case in a positive manner, and then the people had a bit of discussion (which we didn't understand because it was in K'iche'). Afterwards, they asked what everyone thought, and there was a chorus of "otz," meaning "ok!" We were so grateful!
December 7, 2014
Found water pipes
While they were digging, the workers uncovered some water pipes. We knew these pipes were there, but before we started digging, the community leaders had told us we couldn't move them due to a community rule. It was very frustrating for us, because their rules are based on tradition rather than logic. There are about 25 users downstream from our land that use water from this "second water project" pipe, and they are worried that moving the pipe will worsen their service. Our water connection is not to this project, but to another pipe for the "third water project" which also runs through our land above the house site.
There are other branches that also run to neighbor's houses. We hoped by uncovering the pipes, the leaders might understand why we need to move the pipe(s). We don't really want a pipe through our dining room!
| The main pipe we found runs diagonally through our house site and parking area. |
| A branch to a neighbor runs through the ministry building site. |
November 30, 2014
Leveling the land
Since the ground is so hard on our new land, it took more than six weeks for nine men with pickaxes, hoes, and shovels to level three sites and cart away the dirt. The upper level is for the house, the middle level is for a parking area, and the lower level is for the ministry building (where we plan to live for a while at first, while they are building the house).
The ground is so hard that even the water won't drain, so we are going to have to put a good drain around the house foundation.