Our neighborhood road is currently blocked due to the installation of paving bricks on a 60-meter stretch of road. At that rate they will have to block it repeatedly about six times before arriving at our driveway! They only do road improvements once a year when the municipality gives them money, so we are hoping they will do more at a time when they re-block the road in the future.
Here is a map of our current "back way" detour in yellow. It takes about 15 extra minutes of slow driving to navigate with some tricky maneuvering to pass oncoming vehicles. It is mostly a single-car-width dirt road with various cornfields, steep dropoffs, and concrete walls lining the edges. The blue line shows our normal drive out of our neighborhood, which is the part currently blocked.