September 12, 2015

Outhouse floor

They poured concrete pads over the huge holes they had dug earlier.  (See earlier post called "Pit latrine and septic well" in January 2015.)
The (two-seater) outhouse floor is on the right,
with the posts in place for the walls.
Here they are preparing the concrete pad
that will cover the seepage pit.